2011 / Jan 2011
Rocket Lab / captured 23 July 2011 from http://www.rocketlab.co.nz/rocket-lab-news.html
January 2011 – A number of significant milestones for the rapid deployed rocket systems program for L2 Aerospace were achieved. The propulsion section of the program has been completed with the solid motor fully qualified and accepted with over 40 static test firings. Sub systems such as avionics, recovery and launch systems have also been completed. A successful low altitude flight test was conducted with all onboard systems performing nominally.
The quote is the release as captured. Not a rklb.report rewrite. Not affiliated with Rocket Lab.